STAGE OF COMPLETION OF THE PROJECTS
SEE STAGE OF COMPLETION – 80 STEFAN TOSHEV PROJECT
STRUCTURE – reinforced concrete, monolithic
EXTERNAL WALLS – Wienerberger brick wall 25 cm and heat insulation – 8 cm and 10 cm
FACADES – Etalbond, natural stone and structural plaster over heat insulation system
LOBBY AND STAIRS – granite flooring and stairs, aluminium banisters and coloured latex paint
INTERNAL WALLS – machine laid gypsum plaster over brick walls of 25 cm and 12 cm
FLOORS – machine laid smooth cement layer
WINDOWS – PVC – 6-chamber, triple glazing, combined with exterior stone windowsill, and gypsum plaster on the inside, with edge guards
FRONT DOOR – armoured, with three-directional locks
ELECTRICAL INSTALLATIONS – installed to point with mounted apartment panel and dual-rate electric meter
WATER SUPPLY AND SEWERAGE – installed to plug with mounted hot and cold water meters
HEATING– Gas supply
INSTALLATIONS – Telephone, buzz-in system, doorbell system, indoor cable and Internet installations, no outdoor supply
ROOF – bituminous tiles and galvanized powder coated gutters
LIFT – for 4 people; manufactured by ORONA or IZAMET
BALCONIES – granite floors and banisters, according to the architectural design
VERTICAL PLANNING AND COURTYARD LIGHTING – according to the design
SEE STAGE OF COMPLETION – BULGARIA BLVD PROJECT
STRUCTURE – reinforced concrete, monolithic
EXTERNAL WALLS – Wienerberger brick wall 25 cm and heat insulation – 8 cm and 10 cm
FACADES – Etalbond, natural stone and structural plaster over heat insulation system
LOBBY AND STAIRS – granite flooring and stairs, aluminium banisters and coloured latex paint
INTERNAL WALLS – machine laid gypsum plaster over brick walls of 25 cm and 12 cm
FLOORS – machine laid smooth cement layer
WINDOWS – PVC – 6-chamber, triple glazing, combined with exterior stone windowsill, and gypsum plaster on the inside, with edge guards
FRONT DOOR – armoured, with three-directional locks
ELECTRICAL INSTALLATIONS – installed to point with mounted apartment panel and dual-rate electric meter
WATER SUPPLY AND SEWERAGE – installed to plug with mounted hot and cold water meters
HEATING– Gas supply
INSTALLATIONS – Telephone, buzz-in system, doorbell system, indoor cable and Internet installations, no outdoor supply
ROOF – bituminous tiles and galvanized powder coated gutters
LIFT – for 4 people; manufactured by ORONA or IZAMET
BALCONIES – granite floors and banisters, according to the architectural design
VERTICAL PLANNING AND COURTYARD LIGHTING – according to the design
SEE STAGE OF COMPLETION – REDUTA ACADEMIC STADIUM PROJECT
STRUCTURE – reinforced concrete, monolithic
EXTERNAL WALLS – Wienerberger brick wall 25 cm and heat insulation – 8 cm and 10 cm
FACADES – Etalbond, natural stone and structural plaster over heat insulation system
LOBBY AND STAIRS – granite flooring and stairs, aluminium banisters and coloured latex paint
INTERNAL WALLS – machine laid gypsum plaster over brick walls of 25 cm and 12 cm
FLOORS – machine laid smooth cement layer
WINDOWS – PVC – 6-chamber, triple glazing, combined with exterior stone windowsill, and gypsum plaster on the inside, with edge guards
FRONT DOOR – armoured, with three-directional locks
ELECTRICAL INSTALLATIONS – installed to point with mounted apartment panel and dual-rate electric meter
WATER SUPPLY AND SEWERAGE – installed to plug with mounted hot and cold water meters
HEATING– Central heating system; installation with pipe distribution; fully equipped substation
INSTALLATIONS – Telephone, buzz-in system, doorbell system, indoor cable and Internet installations, no outdoor supply
ROOF – bituminous tiles and galvanized powder coated gutters
LIFT – for 4 people; manufactured by ORONA or IZAMET
BALCONIES – granite floors and banisters, according to the architectural design
VERTICAL PLANNING AND COURTYARD LIGHTING – according to the design